How Much Concrete Do I Need for a 14x20 Shed Base?
A 14 ft × 20 ft shed base covers 280 sq ft. At 4 inches thick with 10% extra for spillage and uneven grade, you need 3.8 cubic yards (102.7 cu ft), which equals 172 bags of 80 lb mix or 229 bags of 60 lb mix.
Concrete needed
cubic yards
- Volume
- cu ft
- 80 lb bags
- 60 lb bags
- Ready-mix cost (est.)
- Most ready-mix suppliers have a 1 cubic yard minimum; bags are usually cheaper below that.
Concrete needed for other shed base sizes
| Dimensions | Floor area | Concrete needed |
|---|---|---|
| 14 × 18 ft | 252 sq ft | 3.42 cubic yards |
| 16 × 16 ft | 256 sq ft | 3.48 cubic yards |
| 15 × 18 ft | 270 sq ft | 3.67 cubic yards |
| 12 × 24 ft | 288 sq ft | 3.91 cubic yards |
| 16 × 18 ft | 288 sq ft | 3.91 cubic yards |
| 15 × 20 ft | 300 sq ft | 4.07 cubic yards |
Need a different shape or size? Use the full Concrete Calculator and read our step-by-step measuring guide.
Frequently asked questions
How many bags of concrete for a 14x20 shed base?
At 4 inches thick, a 14 ft × 20 ft shed base takes about 172 bags of 80 lb concrete or 229 bags of 60 lb concrete, including 10% waste.
Should I use bags or ready-mix for a 14x20 shed base?
This job needs 3.8 cubic yards. Above roughly 1 cubic yard, ready-mix delivery (about $627 here) is usually faster and cheaper than mixing bags by hand.