Skip to content
EasyRenovateCalc All calculators

How Much Concrete Do I Need for a 6x8 Shed Base?

A 6 ft × 8 ft shed base covers 48 sq ft. At 4 inches thick with 10% extra for spillage and uneven grade, you need 0.65 cubic yards (17.6 cu ft), which equals 30 bags of 80 lb mix or 40 bags of 60 lb mix.

Concrete Calculator

Results update as you type. All measurements in feet unless noted.

ft

ft

in

+ Show advanced options
%

$

Concrete needed

0.65 cubic yards

Volume
17.6 cu ft
80 lb bags
30
60 lb bags
40
Ready-mix cost (est.)
$108
  • Most ready-mix suppliers have a 1 cubic yard minimum; bags are usually cheaper below that.

Concrete needed for other shed base sizes

Concrete Calculator results for common shed bases sizes
Dimensions Floor area Concrete needed
6 × 6 ft 36 sq ft 0.49 cubic yards
5 × 8 ft 40 sq ft 0.54 cubic yards
5 × 10 ft 50 sq ft 0.68 cubic yards
6 × 10 ft 60 sq ft 0.81 cubic yards
7 × 9 ft 63 sq ft 0.86 cubic yards
8 × 8 ft 64 sq ft 0.87 cubic yards

Need a different shape or size? Use the full Concrete Calculator and read our step-by-step measuring guide.

Frequently asked questions

How many bags of concrete for a 6x8 shed base?

At 4 inches thick, a 6 ft × 8 ft shed base takes about 30 bags of 80 lb concrete or 40 bags of 60 lb concrete, including 10% waste.

Should I use bags or ready-mix for a 6x8 shed base?

This job needs 0.65 cubic yards. Above roughly 1 cubic yard, ready-mix delivery (about $108 here) is usually faster and cheaper than mixing bags by hand.