How Much Concrete Do I Need for a 12x16 Shed Base?
A 12 ft × 16 ft shed base covers 192 sq ft. At 4 inches thick with 10% extra for spillage and uneven grade, you need 2.61 cubic yards (70.4 cu ft), which equals 118 bags of 80 lb mix or 157 bags of 60 lb mix.
Concrete needed
cubic yards
- Volume
- cu ft
- 80 lb bags
- 60 lb bags
- Ready-mix cost (est.)
- Most ready-mix suppliers have a 1 cubic yard minimum; bags are usually cheaper below that.
Concrete needed for other shed base sizes
| Dimensions | Floor area | Concrete needed |
|---|---|---|
| 12 × 14 ft | 168 sq ft | 2.28 cubic yards |
| 13 × 13 ft | 169 sq ft | 2.3 cubic yards |
| 12 × 15 ft | 180 sq ft | 2.44 cubic yards |
| 13 × 15 ft | 195 sq ft | 2.65 cubic yards |
| 14 × 14 ft | 196 sq ft | 2.66 cubic yards |
| 10 × 20 ft | 200 sq ft | 2.72 cubic yards |
Need a different shape or size? Use the full Concrete Calculator and read our step-by-step measuring guide.
Frequently asked questions
How many bags of concrete for a 12x16 shed base?
At 4 inches thick, a 12 ft × 16 ft shed base takes about 118 bags of 80 lb concrete or 157 bags of 60 lb concrete, including 10% waste.
Should I use bags or ready-mix for a 12x16 shed base?
This job needs 2.61 cubic yards. Above roughly 1 cubic yard, ready-mix delivery (about $430 here) is usually faster and cheaper than mixing bags by hand.