A 14 ft × 14 ft shed base covers 196 sq ft. At 4 inches thick with 10% extra for spillage and uneven grade, you need 2.66 cubic yards (71.9 cu ft), which equals 120 bags of 80 lb mix or 160 bags of 60 lb mix.

Concrete Calculator

Results update as you type. All measurements in feet unless noted.

ft

ft

in

+ Show advanced options
%

$

Concrete needed

2.66 cubic yards

Volume
71.9 cu ft
80 lb bags
120
60 lb bags
160
Ready-mix cost (est.)
$439
  • Most ready-mix suppliers have a 1 cubic yard minimum; bags are usually cheaper below that.

Concrete needed for other shed base sizes

Concrete Calculator results for common shed bases sizes
Dimensions Floor area Concrete needed
12 × 15 ft 180 sq ft 2.44 cubic yards
12 × 16 ft 192 sq ft 2.61 cubic yards
13 × 15 ft 195 sq ft 2.65 cubic yards
10 × 20 ft 200 sq ft 2.72 cubic yards
12 × 18 ft 216 sq ft 2.93 cubic yards
14 × 16 ft 224 sq ft 3.04 cubic yards

Need a different shape or size? Use the full Concrete Calculator and read our step-by-step measuring guide.

Frequently asked questions

How many bags of concrete for a 14x14 shed base?

At 4 inches thick, a 14 ft × 14 ft shed base takes about 120 bags of 80 lb concrete or 160 bags of 60 lb concrete, including 10% waste.

Should I use bags or ready-mix for a 14x14 shed base?

This job needs 2.66 cubic yards. Above roughly 1 cubic yard, ready-mix delivery (about $439 here) is usually faster and cheaper than mixing bags by hand.